Low stock

Pink Single Sleeping Bag 3-4 Season Thermal Camping Hiking Outdoor 213cm

SKU: SB-S-CURVE-PK

Key Highlights:

  • 3-4 Season Camping Comfort – Designed for outdoor adventures with a temperature range of -5°C to 20°C, providing cozy warmth from spring through winter.
  • Premium 500gsm Hollow Fibre Insulation – Filled with high-density hollow fibre and soft polyester pongee lining for lightweight warmth, comfort, and breathability.
  • Spacious Adult Size Design – Generous 213cm x 75cm dimensions provide plenty of room to stretch and relax while camping, hiking, or travelling.
  • Water-Resistant & Durable Construction – Made with tough 190T polyester ripstop outer fabric to help protect against moisture while delivering long-lasting outdoor performance.
  • Portable Travel-Friendly Design – Lightweight 2kg design packs neatly into the included carry bag with adjustable hood, secure straps, and double-opening zippers for convenience.
  • Ships from VIC, AUSTRALIA

Price
$49.95
Shipping Estimate
Out of stock
Description

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features:
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content:
Single Sleeping Bag x 1
Carry bag x 1

SB-S-CURVE-PK

This product comes with 1 year warranty

Shipping information

Item will be shipped within 1-3 working days from VIC, AUSTRALIA with most orders deliver within 7-10 working days Australia wide.

For Delivery Time Frame and More Info Click Here

14 Days Returns

Purchase with peace of mind knowing item can be returned within 14 days of delivery.

Full Details Click Here

Have a question?
Pink Single Sleeping Bag 3-4 Season Thermal Camping Hiking Outdoor 213cm

Pink Single Sleeping Bag 3-4 Season Thermal Camping Hiking Outdoor 213cm

Price
$49.95

Product information

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag—ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features:
500g/m² hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content:
Single Sleeping Bag x 1
Carry bag x 1

SB-S-CURVE-PK

This product comes with 1 year warranty